Upper Distrato Powerplant
|
| Client |
|
Pindos Energiaki, Greece
|
| Location |
 |
Distrato, northern Greece
|
| Head |
|
488 m
|
| Discharge |
|
514 l/s
|
| Penstock |
|
Length: 4 400m, Diameter: 610 mm, steel, underground
|
| Output |
|
2 014 kW
|
| Commissioning |
|
2002
|
WKV scope
|
| Turbine |
 |
 |
Single jet Pelton |
|
|
 |
Nozzle and deflector controls |
|
|
 |
Hydraulic opening of the nozzle, spring closure |
|
|
 |
Hydraulic opening of the deflector, closure by counterweight
|
| Governors |
|
WKV level controller for parallel operation
|
| Generator |
|
2 517 kVA, 690 V, 50 Hz, 1 000 rpm
|
| Turbine inlet valve |
|
Electrically operated butterfly valve, DN 400 PN 64
|
| Design |
|
Complete layout and design of the facility including survey of the construction site, inlet and outlet, layout and design of the penstock and powerhouse
|
|
|
|
|