Upper Distrato Powerplant



Client Pindos Energiaki, Greece

Location Distrato, northern Greece

Head 488 m

Discharge 514 l/s

Penstock Length: 4 400m, Diameter: 610 mm,
steel, underground

Output 2 014 kW

Commissioning 2002



WKV scope



Turbine Single jet Pelton
Nozzle and deflector controls
Hydraulic opening of the nozzle, spring closure
Hydraulic opening of the deflector, closure by counterweight

Governors WKV level controller for parallel operation

Generator 2 517 kVA, 690 V, 50 Hz, 1 000 rpm

Turbine inlet valve Electrically operated butterfly valve, DN 400 PN 64

Design Complete layout and design of the facility including survey of the construction site, inlet and outlet, layout and design of the penstock and powerhouse