Belihul Oya Powerplant



Client NIVIDHU (Pvt) Ltd., Colombo, Sri Lanka

Location Sri Lanka

Head 165 m

Discharge 1 600 l/s

Output 2 130 kW

Commissioning 2002



WKV scope: 2 units



Turbine Single jet Turgo
Nozzle and deflector controls
Hydraulic opening of the nozzle, spring closure
Hydraulic opening of the deflector, closure by counterweight

Governors WKV level control for parallel operation

Generator 50 Hz, 750 rpm

Turbine inlet valve Manually operated butterfly valve, DN 600 PN 25

Switchboards and controls WKV designed and manufactured, PLC controlled, fully automatic with remote monitoring (SCADA).